US Army Technical Manual TM 6120-250-34: Substation Trailer MTD 500 KVA AC 416Y
This technical manual provides instructions for the operation and maintenance of the Substation Trailer MTD 500 KVA AC 416Y.
5 out of 5
Language | : | English |
File size | : | 6463 KB |
Text-to-Speech | : | Enabled |
Screen Reader | : | Supported |
Enhanced typesetting | : | Enabled |
Print length | : | 105 pages |
Lending | : | Enabled |
Hardcover | : | 552 pages |
Item Weight | : | 2.1 pounds |
Dimensions | : | 6.14 x 1.25 x 9.21 inches |
Table of Contents
- Section 1:
- Section 2: Operation
- Section 3: Maintenance
- Section 4: Troubleshooting
- Section 5: Appendices
Section 1:
This section provides an overview of the Substation Trailer MTD 500 KVA AC 416Y, including its purpose, capabilities, and limitations.
Purpose
The Substation Trailer MTD 500 KVA AC 416Y is designed to provide temporary electrical power to military installations.
Capabilities
The Substation Trailer MTD 500 KVA AC 416Y is capable of providing the following electrical power:
- 500 kVA of three-phase AC power at 416Y volts
- 250 kVA of single-phase AC power at 240 volts
Limitations
The Substation Trailer MTD 500 KVA AC 416Y is not designed to operate in the following conditions:
- Extreme heat or cold
- High humidity
- Dusty or sandy environments
Section 2: Operation
This section provides instructions for the operation of the Substation Trailer MTD 500 KVA AC 416Y.
Pre-Operation Checks
Before operating the Substation Trailer MTD 500 KVA AC 416Y, the following pre-operation checks must be performed:
- Check the fluid levels in the engine and generator.
- Check the air filter for any dirt or debris.
- Check the fuel lines for any leaks.
- Check the electrical connections for any loose or damaged wires.
Starting the Generator
To start the generator, follow these steps:
- Turn the fuel valve to the "on" position.
- Turn the ignition key to the "start" position.
- Once the generator has started, adjust the throttle to the desired speed.
Connecting the Load
Once the generator is running, the load can be connected. To connect the load, follow these steps:
- Turn off the circuit breaker on the load.
- Connect the load to the generator using the appropriate electrical cables.
- Turn on the circuit breaker on the load.
Stopping the Generator
To stop the generator, follow these steps:
- Turn off the circuit breaker on the load.
- Turn the throttle to the "idle" position.
- Turn the ignition key to the "off" position.
Section 3: Maintenance
This section provides instructions for the maintenance of the Substation Trailer MTD 500 KVA AC 416Y.
Daily Maintenance
The following daily maintenance tasks should be performed on the Substation Trailer MTD 500 KVA AC 416Y:
- Check the fluid levels in the engine and generator.
- Check the air filter for any dirt or debris.
- Check the fuel lines for any leaks.
- Check the electrical connections for any loose or damaged wires.
Weekly Maintenance
The following weekly maintenance tasks should be performed on the Substation Trailer MTD 500 KVA AC 416Y:
- Clean the air filter.
- Change the oil in the engine and generator.
- Inspect the fuel lines for any leaks.
- Inspect the electrical connections for any loose or damaged wires.
Monthly Maintenance
The following monthly maintenance tasks should be performed on the Substation Trailer MTD 500 KVA AC 416Y:
- Change the spark plugs.
- Inspect the generator brushes.
- Inspect the voltage regulator.
Annual Maintenance
The following annual maintenance tasks should be performed on the Substation Trailer MTD 500 KVA AC 416Y:
- Overhaul the engine.
- Overhaul the generator.
- Inspect the trailer for any damage.
Section 4: Troubleshooting
This section provides troubleshooting tips for the Substation Trailer MTD 500 KVA AC 416Y.
Problem: The generator will not start.
Possible causes:
- The fuel tank is empty.
- The fuel lines are clogged.
- The spark plugs are fouled.
- The battery is dead.
Problem: The generator is running but not producing any power.
Possible causes:
- The generator brushes are worn out.
- The voltage regulator is malfunctioning.
- The electrical connections are loose or damaged.
Problem: The generator is overheating.
Possible causes:
- The air filter is clogged.
- The cooling system is malfunctioning.
- The generator is overloaded.
Section 5: Appendices
This section contains the following appendices:
- Appendix A: Technical Specifications
- Appendix B: Wiring Diagrams
- Appendix C: Parts List
5 out of 5
Language | : | English |
File size | : | 6463 KB |
Text-to-Speech | : | Enabled |
Screen Reader | : | Supported |
Enhanced typesetting | : | Enabled |
Print length | : | 105 pages |
Lending | : | Enabled |
Hardcover | : | 552 pages |
Item Weight | : | 2.1 pounds |
Dimensions | : | 6.14 x 1.25 x 9.21 inches |
Do you want to contribute by writing guest posts on this blog?
Please contact us and send us a resume of previous articles that you have written.
- Book
- Chapter
- Text
- Genre
- Library
- Magazine
- Newspaper
- Paragraph
- Bookmark
- Shelf
- Bibliography
- Foreword
- Synopsis
- Annotation
- Manuscript
- Scroll
- Classics
- Library card
- Biography
- Autobiography
- Memoir
- Reference
- Encyclopedia
- Thesaurus
- Narrator
- Card Catalog
- Borrowing
- Archives
- Study
- Scholarly
- Lending
- Journals
- Reading Room
- Interlibrary
- Literacy
- Study Group
- Thesis
- Book Club
- Theory
- Textbooks
- Anna Krien
- Pete Croatto
- Wislawa Szymborska
- Donna Lynn
- Edward Onaci
- Thorsten Botz Bornstein
- Gary S Aumiller
- Dov S Zakheim
- Dick Morris
- Jon Sopel
- M A Noble
- Chantel Stephens
- Dietrich Rueschemeyer
- Sage Alexander
- Ed Okonowicz
- Nicole Casey
- Farhad B Naini
- Karen Ferguson
- Phil Croucher
- Maggie Smith
Light bulbAdvertise smarter! Our strategic ad space ensures maximum exposure. Reserve your spot today!
- Jace MitchellFollow ·8.4k
- Guillermo BlairFollow ·18.7k
- Brenton CoxFollow ·7.1k
- Avery SimmonsFollow ·8k
- Lee SimmonsFollow ·13.2k
- Rubén DaríoFollow ·2.3k
- Aldous HuxleyFollow ·16.5k
- Isaiah PriceFollow ·3k
The Double Lives of Black Women in America: Navigating...
Black women in...
Banging My Billionaire Boss: A Love Story for the Ages...
Chapter 1: The Interview I was...
The Struggle for Black Enfranchisement: A Complex and...
The struggle for...
When Savage Needs Love: His BBW Obsession
When Savage Needs Love is a 2019 romantic...
Black Women and Public Health: A Historical Examination...
Black women have...
5 out of 5
Language | : | English |
File size | : | 6463 KB |
Text-to-Speech | : | Enabled |
Screen Reader | : | Supported |
Enhanced typesetting | : | Enabled |
Print length | : | 105 pages |
Lending | : | Enabled |
Hardcover | : | 552 pages |
Item Weight | : | 2.1 pounds |
Dimensions | : | 6.14 x 1.25 x 9.21 inches |